濰坊電梯門套:電梯門套安裝的幾個(gè)要點(diǎn)
一、電梯門套安裝方法:
1、 Installation method for elevator door frames:
1.將廳門處門洞進(jìn)行處理。廳門處一般是安裝石材覆蓋在表面。石材在安裝前要進(jìn)行表面處理,保持清潔和干燥度,含水率要小于8%。
1. Handle the door opening at the hall door. The hall door is usually covered with stone on the surface. Stone should undergo surface treatment before installation to maintain cleanliness and dryness, with a moisture content of less than 8%.
2.用來安裝門套的石材應(yīng)該保持花紋、顏色的一致性。所以要進(jìn)行仔細(xì)甄選,避免出現(xiàn)嚴(yán)重的色差和花紋差異性。每一層的所有電梯門套石材都要保持統(tǒng)一性。
2. The stone used for installing door frames should maintain consistency in pattern and color. So careful selection is necessary to avoid serious color and pattern differences. All elevator door frames on each floor must have consistent stone materials.
3.正式安裝石材之間,再將石材做一次徹底清理,結(jié)構(gòu)部分不能留有渣質(zhì),表面無積灰污垢。然后用墨線彈出水平線和垂直線。
3. Before formally installing the stone, thoroughly clean the stone again. The structural parts should not have any residue, and the surface should be free of accumulated dust and dirt. Then use ink lines to pop out horizontal and vertical lines.
4.根據(jù)彈出的線條位置,使用鉆機(jī)在需要打孔處打孔??籽鄣闹睆揭话闶?mm左右,深度是12mm左右。按照施工標(biāo)準(zhǔn),每塊石板上、下面都要打孔眼,位于石板中間位置。
4. According to the position of the pop-up line, use a drilling rig to drill holes at the required locations. The diameter of the hole is generally around 8mm and the depth is around 12mm. According to construction standards, holes should be drilled above and below each stone slab, located in the middle of the slab.
5.將膨脹螺栓固定在墻面上,然后將角架固定好,再將掛件安裝在角架上。
5. Fix the expansion bolt on the wall, then fix the corner bracket, and then install the hanging piece on the corner bracket.
6.角架和掛件安裝好之后,進(jìn)行石材開槽工序。將石材固定在掛件上時(shí)使用專用的大理石膠,黏結(jié)好之后反復(fù)壓幾次,確定不會(huì)脫落。
After the installation of the corner bracket and hanging parts, proceed with the stone slotting process. When fixing the stone on the pendant, use a special marble adhesive. After bonding, press it repeatedly several times to ensure that it does not fall off.
7.安裝好之后的電梯門套應(yīng)該做到光面平整,立面垂直,接縫平直,接縫寬度的偏差不能超過2mm。
7. After installation, the elevator door frame should be smooth and flat, with a vertical facade and straight seams. The deviation in seam width should not exceed 2mm.
8.電梯門套全部安裝完之后,將表面石材做一次清理工作,即可投入使用。
After all the elevator door frames are installed, clean the surface stone once and it can be put into use.
二、電梯門套安裝知識(shí):
2、 Knowledge of elevator door frame installation:
1、墻面所用石材的種類、大小、性能和等級(jí),應(yīng)該符合的規(guī)定等級(jí)。
1. The type, size, performance, and grade of stone used on the wall should comply with the national regulations.
2、墻面對(duì)大理石的色澤、立面分格、花色、花紋和圖案應(yīng)符合要求。
2. The color, facade division, pattern, pattern, and pattern of marble on the wall should meet the requirements.
3、石材孔、槽的數(shù)量、深度、位置、尺寸應(yīng)符合設(shè)計(jì)要求不準(zhǔn)有裂紋、缺邊崩角等現(xiàn)象。
3. The number, depth, position, and size of stone holes and grooves should meet the design requirements and there should be no cracks, missing edges, or corners.
4、墻面干掛部件工藝應(yīng)符合規(guī)定。
4. The process of wall hanging components should comply with national regulations.
5、石材表面和板縫的處理應(yīng)符合設(shè)計(jì)要求。
5. The treatment of stone surface and slab joints should meet the design requirements.
6、石材表面(六面)均需做防堿化和防水處理。
6. The surface of the stone (six sides) needs to be treated with anti alkalization and waterproofing.