不銹鋼電梯門(mén)套包邊定制的事項(xiàng)
不銹鋼電梯門(mén)套是在原來(lái)木質(zhì)電梯門(mén)套的基礎(chǔ)上發(fā)展而來(lái)的,它更加符合現(xiàn)代人對(duì)于裝修、時(shí)尚、簡(jiǎn)約的要求,所以被越來(lái)越多的人所使用?,F(xiàn)在的高層住宅、寫(xiě)字樓,大多都會(huì)安裝電梯,而安裝電梯少不了要做電梯門(mén)套,那么電梯門(mén)套如何制作呢?不銹鋼門(mén)套包邊又是怎樣的呢?接下來(lái)就跟著小編一起來(lái)看看吧
Stainless steel elevator door frames are developed on the basis of the original wooden elevator door frames. They are more in line with modern people's requirements for environmental protection, fashion, and simplicity in decoration, so they are being used by more and more people. Nowadays, most high-rise residential and office buildings are equipped with elevators, and installing elevators requires the use of elevator door frames. So, how to make elevator door frames? What is the stainless steel door frame edging like? Next, let's take a look with the editor
線條規(guī)格:寬80cm(即含擋板和壓框),高120cm。線條顏色:與原墻面磚石或木飾面保持同一材質(zhì)及色澤。
Line specifications: 80cm wide (including baffle and pressure frame), 120cm high. Line color: Maintain the same material and color as the original wall brick, stone or wood veneer.
線條工藝:粘貼白水泥(仿瓷涂料)線條于基體表面(厚度3~4mm),采用專用膠霸粘結(jié)劑,使線條牢固有力,整齊美觀。線條收口:為確保線條完全覆蓋門(mén)洞上方部位,需預(yù)留4~6mm伸縮量,并將此部位清理干凈。為避免修補(bǔ)過(guò)程造成界限模糊,建議兩端頭打磨后倒角處理。
Line technology: Paste high-quality white cement (porcelain like coating) lines on the surface of the substrate (with a thickness of 3-4 mm), using a special adhesive to make the lines firm, powerful, neat and beautiful. Line closure: To ensure that the line completely covers the upper part of the door opening, it is necessary to reserve a 4-6mm extension and clean this area. To avoid blurring the boundaries during the repair process, it is recommended to polish and chamfer both ends.
電梯不銹鋼門(mén)套包邊做法(資料不準(zhǔn)確,僅供參考。
The method of wrapping stainless steel door frames for elevators (information not accurate, for reference only).
剪裁、包邊 ,測(cè)量好需要安裝電梯門(mén)套線條的尺寸大小,并按照尺寸進(jìn)行剪裁。接下來(lái),對(duì)門(mén)套線條的一周進(jìn)行45度斜切處理,使其更加圓潤(rùn)美觀。然后,用專用包邊條將門(mén)套線條多余的部分包裹起來(lái),注意要留出伸縮縫。后,把門(mén)套線條存放在干凈整潔的地方,待用。
Cutting and edging: First, measure the size of the line that needs to be installed on the elevator door frame and cut according to the size. Next, perform a 45 degree diagonal cut on the perimeter of the door frame line to make it more rounded and aesthetically pleasing. Then, wrap the excess part of the door frame line with a dedicated edging strip, making sure to leave expansion joints. Afterwards, store the door frame lines in a clean and tidy place for later use.
固定骨架 在墻體上打孔,并且預(yù)埋膨脹螺栓,將不銹鋼電梯門(mén)套線條的骨架安裝在墻體上。根據(jù)事先確定的位置,用射釘槍將骨架牢牢地固定在墻體上。然后,調(diào)整好骨架的高度和水平度,再將門(mén)套線條緊貼著墻體插入到骨架內(nèi)。為了避免門(mén)套線條發(fā)生偏移,需要用錘子或者木板等物品將其輕輕敲入到墻體中。,把線條立好,然后彈出線條的中心線,并標(biāo)注出線條各個(gè)轉(zhuǎn)折點(diǎn)的準(zhǔn)確尺寸。
Fix the framework by drilling holes on the wall and embed expansion bolts, and install the framework of stainless steel elevator door frame lines on the wall. According to the predetermined position, use a nail gun to firmly fix the skeleton on the wall. Then, adjust the height and levelness of the skeleton, and insert the door pocket line close to the wall into the skeleton. To avoid deviation of the door frame line, it is necessary to gently tap it into the wall with a hammer or wooden board. Firstly, erect the line, then pop out the centerline of the line and mark the accurate dimensions of each turning point of the line.
其次,把裁剪好的鋁合金靠尺放到線條凹槽內(nèi),檢查校正合適后,以這個(gè)線條為準(zhǔn)往兩邊翻卷定位布——封堵線條頂部及底部的縫隙。再次,根據(jù)線條實(shí)際尺寸,確定線條具體位置,鉆孔定位,并打入膨脹螺栓(6mm深)。后,對(duì)于特殊造型,如弧形線條等,可以采用相應(yīng)的連接件拼接,增加整體效果。
Secondly, place the cut aluminum alloy ruler into the groove of the line, check and correct it properly, and then roll the positioning cloth on both sides based on this line - seal the gaps at the top and bottom of the line. Once again, based on the actual size of the line, determine the specific position of the line, drill holes for positioning, and insert expansion bolts (6mm deep). Later, for special shapes such as curved lines, corresponding connectors can be used for splicing to increase the overall effect.
不銹鋼門(mén)套安裝
Installation of stainless steel door frames
在安裝不銹鋼門(mén)套之前,需要先對(duì)墻體進(jìn)行基層處理,確保墻面平整、干凈、無(wú)油污等雜質(zhì)。然后,使用水泥釘或膨脹螺栓等工具將不銹鋼門(mén)套固定在墻體上,并確保其與墻體之間的連接緊密可靠。不銹鋼門(mén)套一般包四周和上下框(預(yù)留伸縮縫)。特殊情況如懸掛大型吊燈可能需要另外加厚兩塊立板來(lái)保證起步平整,并且好采用膨脹螺栓與墻體固定。
Before installing the stainless steel door frame, it is necessary to first perform a base treatment on the wall to ensure that it is flat, clean, and free of impurities such as oil stains. Then, use tools such as cement nails or expansion bolts to fix the stainless steel door frame to the wall and ensure its tight and reliable connection with the wall. Stainless steel door frames generally include the surrounding area and upper and lower frames (with reserved expansion joints). In special circumstances such as hanging large chandeliers, it may be necessary to thicken two additional vertical plates to ensure a smooth start, and it is easy to use expansion bolts to fix them to the wall.
在不銹鋼門(mén)套安裝完成后,需要進(jìn)行檢查和調(diào)整。,需要檢查門(mén)套的尺寸是否符合設(shè)計(jì)要求,并確保其安裝位置的準(zhǔn)確性和穩(wěn)定性。然后,需要調(diào)整門(mén)套的高度和左右位置,以確保其與墻體之間的距離符合相關(guān)標(biāo)準(zhǔn)。
After the installation of the stainless steel door frame is completed, it needs to be inspected and adjusted. Firstly, it is necessary to check whether the size of the door frame meets the design requirements and ensure the accuracy and stability of its installation position. Then, it is necessary to adjust the height and left and right positions of the door frame to ensure that its distance from the wall meets relevant standards.
此外,還需要注意門(mén)套與地面之間的距離,確保其不超過(guò)1.5米,并且保持水平。如果需要,可以使用橡膠墊片或者泡沫塑料等材料進(jìn)行減震處理,以減少噪音和震動(dòng)對(duì)周?chē)h(huán)境的影響。
In addition, it is necessary to pay attention to the distance between the door frame and the ground, ensuring that it does not exceed 1.5 meters and remains level. If necessary, rubber gasket or foam plastic and other materials can be used for shock absorption to reduce the impact of noise and vibration on the surrounding environment.
安裝注意事項(xiàng):
Installation precautions:
在安裝的時(shí)候,還應(yīng)注意與墻體之間必須澆水濕潤(rùn)。防止因?yàn)闇囟茸兓瘯?huì)影響到粘貼效果,出現(xiàn)空鼓、脫落的現(xiàn)象。
During installation, attention should also be paid to watering the area between it and the wall. Prevent the phenomenon of hollowing and peeling due to temperature changes that may affect the bonding effect.
在貼磚前,必須將基層清理干凈;所有孔洞都要提前堵好,避免后期打穿樓板;陰陽(yáng)角處應(yīng)護(hù)成圓弧形(順直且無(wú)磕碰現(xiàn)象);地面需充分澆水潮濕;2天以上才能進(jìn)行鋪貼瓷磚。在施工過(guò)程中,禁止沾染油污或其它溶液,以免造成表面拉毛等問(wèn)題。
Before tiling, the base layer must be cleaned thoroughly; All holes should be blocked in advance to avoid penetrating the floor slab in the later stage; The corners should be protected in a circular arc shape (straight and without any collision); The ground needs to be adequately watered and moist; Tile laying can only be carried out after 2 days or more. During the construction process, it is prohibited to get contaminated with oil or other solutions to avoid surface roughness and other problems.